GitHub Actions schedule: UTC only, and delays are normal
One-line answer: The real constraints of the schedule trigger: UTC interpretation, the five-minute minimum, automatic disabling and delay.
GitHub Actions uses cron syntax in its schedule trigger, but with constraints that differ from a server crontab. Know them before relying on it for business-hour work.
Always UTC
Actions schedules are interpreted in UTC. 09:00 in Seoul is 00:00 UTC, so the expression is 0 0 * * *. Zones with daylight saving shift by an hour twice a year, which is why UTC is the sane basis for any schedule that must not drift.
on:
schedule:
- cron: '0 0 * * *' # 09:00 KST
workflow_dispatch:
jobs:
build:
runs-on: ubuntu-latest
steps:
- uses: actions/checkout@v4
- run: ./scripts/daily.sh
Minimum interval and delay
The minimum interval is five minutes. More importantly, runs are not guaranteed to start on time: GitHub delays scheduled workflows under load, and delays of several minutes to tens of minutes are common. For time-critical work, trigger workflow_dispatch from an external scheduler instead.
Automatic disabling
Scheduled workflows are disabled after 60 days without repository activity. A repository that only publishes data can easily go quiet, so re-enable the workflow periodically. Only workflows on the default branch are scheduled.
Overlap and failure
Delays can make runs overlap. Set a concurrency group and keep cancel-in-progress: false so the previous run finishes. For retries, use a retry action or step-level retry rather than assuming the schedule will catch up.
| Constraint | Value | Effect |
|---|---|---|
| Time zone | UTC only | 09:00 KST is 00:00 UTC |
| Minimum interval | 5 minutes | no minute-precision jobs |
| Delay | minutes to tens of minutes | unsuitable for time-critical work |
| Disabling | 60 days inactive | re-enable periodically |
What it is good for
- Daily builds and static site deploys
- Periodic dependency checks
- Backups and report generation
It is a poor fit for settlement, billing or notifications that need minute precision. Use a dedicated scheduler and queue for those, with Actions as a helper.
Paste an expression and see its next run times right away.
Open CronPulseFrequently asked questions
How do I schedule 09:00 Korean time in Actions?
Write it as 00:00 UTC: cron: '0 0 * * *'. In a DST zone the UTC offset changes seasonally, so define the job in UTC and convert in the job if needed.
My scheduled workflow suddenly stopped.
Check the 60-day inactivity disablement, whether the workflow is on the default branch, syntax errors and repository permissions. You can re-enable it from the Actions tab.
Sources
Related reading
- Cron in five fields: minute, hour, day, month, weekdayWhat each of the five Unix cron fields means, which values are allowed, and how to read an expression without guessing.
- Cron special characters: *, /, -, commas, ?, L, W and #The eight symbols that make cron expressive, what each one means, and where implementations disagree.
- Five-field Unix cron versus six-field Quartz and EventBridgeSeconds, weekday numbers, the ? rule and the year field: what changes when you move a schedule between cron dialects.
- Daylight saving and cron: the day 02:30 disappearsHow clock changes affect cron runs, and how to move jobs out of the 2–3 AM danger window.