AWS EventBridge cron: six fields, ? and the year
One-line answer: How EventBridge cron differs from Quartz, how the ? rule works, and what the year field changes.
AWS EventBridge (formerly CloudWatch Events) cron has six fields, but the extra field is a year, not seconds. The order is minute hour day month weekday year.
Side by side
| Product | Example | Meaning |
|---|---|---|
| Unix cron | 0 9 * * 1-5 | Weekdays at 09:00 |
| Quartz | 0 0 9 ? * MON-FRI | Weekdays at 09:00 |
| EventBridge | 0 9 ? * MON-FRI * | Weekdays at 09:00 |
The three lines describe the same job with different field counts and orders. EventBridge has no seconds and its final field is a four-digit year or *.
daily 09:00 (UTC) 0 9 * * ? *
weekdays 09:00 (UTC) 0 0 ? * MON-FRI *
2026 only 0 9 ? * MON-FRI 2026
The ? rule is mandatory
EventBridge requires exactly one of day-of-month or day-of-week to be ?. Setting both to * is rejected. “Every day” is 0 9 * * ? *; “every Monday” is 0 9 ? * 2 *. Weekdays are numbered 1 (Sunday) to 7 (Saturday).
The year field
0 9 ? * MON-FRI 2026 runs on weekdays at 09:00 in 2026 only. That suits a campaign or a temporary batch, but the schedule stops when the year changes. For permanent jobs use * and disable the schedule when it should end.
Time zone
EventBridge Scheduler lets you set a time zone separately from the expression; without it the schedule is UTC. If you set a DST zone, the transition-day behaviour is defined by the product documentation, so the safer pattern is UTC plus local-time logic in the job.
Frequent mistakes
- Pasting a Quartz string so the seconds field is read as a year
- Setting both day and weekday to
*, which is rejected - Using Unix weekday numbers (0 = Sunday) and shifting by a day
- Pinning a year and not noticing the schedule stopped
CronPulse reads a six-field expression whose last token is a four-digit year as EventBridge and numbers Sunday as 1. Check the next runs before migrating.
Paste an expression and see its next run times right away.
Open CronPulseFrequently asked questions
How do I schedule 09:00 Korean time in EventBridge?
In UTC it is 0 0 ? * * *. If the scheduler's time zone is Asia/Seoul, use 0 9 ? * * *. Confirm the zone setting first.
Can EventBridge run every few seconds?
No. The minimum unit is one minute. Sub-minute precision needs Step Functions, Lambda scheduling or an application timer.
Sources
Related reading
- Cron in five fields: minute, hour, day, month, weekdayWhat each of the five Unix cron fields means, which values are allowed, and how to read an expression without guessing.
- Cron special characters: *, /, -, commas, ?, L, W and #The eight symbols that make cron expressive, what each one means, and where implementations disagree.
- Five-field Unix cron versus six-field Quartz and EventBridgeSeconds, weekday numbers, the ? rule and the year field: what changes when you move a schedule between cron dialects.
- Daylight saving and cron: the day 02:30 disappearsHow clock changes affect cron runs, and how to move jobs out of the 2–3 AM danger window.